Temporary packaging release
Check whether APL release is correct and print data can be sent. Decision of the sample check.
BM - All-in-One INT
BM
has several possibilities:
- Subsequent correction in status 5 if mandatory, info to TL is done.
- Check and release to label holder before actual release in status 7/9.
- Check and decision whether sample inspection by BM and Pre-press agency necessary and status change to 7 or 9.
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
7 – Print approval packaging
Provision of print data by pre-press agency (or pre-press agency of supplier in case of soft packagings), upload to Celum and entry of delivery date by supplier.
9 – Final approval of packaging
Packaging is finally approved. Upload to Celum if relevant.
In case of print approval without sample check:
Provision of print data by pre-press agency (or pre-press agency of supplier for soft packaging) and upload to Celum if relevant.
BM - All-in-One NAT
BM
has several possibilities:
- Subsequent correction in status 5 if mandatory, info to TL is done.
- Check and release to label holder before actual release in status 7/9.
- Check and decision whether sample inspection by BM and Pre-press agency necessary and status change to 7 or 9.
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
7 – Print approval packaging
Provision of print data by pre-press agency (or pre-press agency of supplier in case of soft packagings), upload to Celum and entry of delivery date by supplier.
9 – Final approval of packaging
Packaging is finally approved. Upload to Celum if relevant.
In case of print approval without sample check:
Provision of print data by pre-press agency (or pre-press agency of supplier for soft packaging) and upload to Celum if relevant.
BM - Allowlist
BM
has several possibilities:
- Subsequent correction in status 5 if mandatory, info to TL is done.
- Check and release to label holder before actual release in status 7/9.
- Check and decision whether sample inspection by BM and Pre-press agency necessary and status change to 7 or 9.
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
7 – Print approval packaging
Provision of print data by pre-press agency (or pre-press agency of supplier in case of soft packagings), upload to Celum and entry of delivery date by supplier.
9 – Final approval of packaging
Packaging is finally approved. Upload to Celum if relevant.
In case of print approval without sample check:
Provision of print data by pre-press agency (or pre-press agency of supplier for soft packaging) and upload to Celum if relevant.
BM - Druckerwechsel
BM
has several possibilities:
- Subsequent correction in status 5 if mandatory, info to TL is done.
- Check and release to label holder before actual release in status 7/9.
- Check and decision whether sample inspection by BM and Pre-press agency necessary and status change to 7 or 9.
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
7 – Print approval packaging
Provision of print data by pre-press agency (or pre-press agency of supplier in case of soft packagings), upload to Celum and entry of delivery date by supplier.
9 – Final approval of packaging
Packaging is finally approved. Upload to Celum if relevant.
In case of print approval without sample check:
Provision of print data by pre-press agency (or pre-press agency of supplier for soft packaging) and upload to Celum if relevant.
BM - Fast Lane 1
BM
has several possibilities:
- Subsequent correction in status 5 if mandatory, info to TL is done.
- Check and release to label holder before actual release in status 7/9.
- Check and decision whether sample inspection by BM and Pre-press agency necessary and status change to 7 or 9.
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
7 – Print approval packaging
Provision of print data by pre-press agency (or pre-press agency of supplier in case of soft packagings), upload to Celum and entry of delivery date by supplier.
9 – Final approval of packaging
Packaging is finally approved. Upload to Celum if relevant.
In case of print approval without sample check:
Provision of print data by pre-press agency (or pre-press agency of supplier for soft packaging) and upload to Celum if relevant.
BM - Fast Lane 2
BM
has several possibilities:
- Subsequent correction in status 5 if mandatory, info to TL is done.
- Check and release to label holder before actual release in status 7/9.
- Check and decision whether sample inspection by BM and Pre-press agency necessary and status change to 7 or 9.
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
7 – Print approval packaging
Provision of print data by pre-press agency (or pre-press agency of supplier in case of soft packagings), upload to Celum and entry of delivery date by supplier.
9 – Final approval of packaging
Packaging is finally approved. Upload to Celum if relevant.
In case of print approval without sample check:
Provision of print data by pre-press agency (or pre-press agency of supplier for soft packaging) and upload to Celum if relevant.
BM - Fast Lane 4 - Umsetzung durch Lieferant
BM
has several possibilities:
- Subsequent correction in status 5 if mandatory, info to TL is done
- Check and release to label holder before actual release in status 7
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
7 – Print approval packaging
Provision of print data by pre-press agency (or pre-press agency of supplier in case of soft packagings) and entry of delivery date by supplier.
BM - Relaunch Design
BM
has several possibilities:
- Subsequent correction in status 5 if mandatory, info to TL is done.
- Check and release to label holder before actual release in status 7/9.
- Check and decision whether sample inspection by BM and Pre-press agency necessary and status change to 7 or 9.
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
7 – Print approval packaging
Provision of print data by pre-press agency (or pre-press agency of supplier in case of soft packagings), upload to Celum and entry of delivery date by supplier.
9 – Final approval of packaging
Packaging is finally approved. Upload to Celum if relevant.
In case of print approval without sample check:
Provision of print data by pre-press agency (or pre-press agency of supplier for soft packaging) and upload to Celum if relevant.
BM - Tray
BM
has several possibilities:
- Subsequent correction in status 5 if mandatory, info to TL is done.
- Check and release to label holder before actual release in status 7/9.
- Check and decision whether sample inspection by BM and Pre-press agency necessary and status change to 7 or 9.
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
7 – Print approval packaging
Provision of print data by pre-press agency (or pre-press agency of supplier in case of soft packagings), upload to Celum and entry of delivery date by supplier.
9 – Final approval of packaging
Packaging is finally approved. Upload to Celum if relevant.
In case of print approval without sample check:
Provision of print data by pre-press agency (or pre-press agency of supplier for soft packaging) and upload to Celum if relevant.
QM - Dekla Anpassung INT
QM
–
BM
The flag “Label check by label owner” must be confirmed or rejected by BM within 2 working days.
Upon release, the job must be changed manually from BM to S9, Flag “Celum Upload Packaging” and “Data Provisioning” to Repro are started.
If rejected, the job automatically switches to S5 unexpected correction.
Status change by BM for label check that require approval:
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
9 – Final packaging approval
Packaging is finally approved. Provision of print data by prepress agency and upload to Celum.
QM - Dekla Anpassung NAT
QM
–
BM
The flag “Label check by label owner” must be confirmed or rejected by BM within 2 working days.
Upon release, the job must be changed manually from BM to S9, Flag “Celum Upload Packaging” and “Data Provisioning” to Repro are started.
If rejected, the job automatically switches to S5 unexpected correction.
Status change by BM for label check that require approval:
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
9 – Final packaging approval
Packaging is finally approved. Provision of print data by prepress agency and upload to Celum.
QM - Allowlist
QM
–
BM
The flag “Label check by label owner” must be confirmed or rejected by BM within 2 working days.
Upon release, the job must be changed manually from BM to S9, Flag “Celum Upload Packaging” and “Data Provisioning” to Repro are started.
If rejected, the job automatically switches to S5 unexpected correction.
Status change by BM for label check that require approval:
5 – Unexpected corrections
Subsequent changes are implemented, loaded into Wave and the approval loop cycle is restarted.
9 – Final packaging approval
Packaging is finally approved. Provision of print data by prepress agency and upload to Celum.
QM - Fast Lane 3
QM
–
See status 9