Packaging approval
The packaging buildup is checked in the APL, the status is automatically changed after completion.
BM - All-in-One INT
BM
The built layout is checked on the part of BM by a Quickcheck.
LF
The layout that has been built and approved by Brand Management must be checked by the supplier with a testing institute.
Attention: There is no correction loop before sending the layout to the testing institute. The requirements for the testing institute check can be found [here].
The following flag (task) will be triggered:
PI Check requested (Timing 4 business days)
After commissioning, the flag must be confirmed. Afterwards, the following flag is triggered:
Upload PI certificate (Timing 8 business days)
Once the certificate or report has been received, it must be checked for queries and open points and clarified with the testing institute if necessary before uploading it in Wave in the job details tab in the supplier area.
Note: After the correction the article doesn’t need to be sent to the testing institute again.
Due to the approval of the Brand Management, a print technical check is also necessary for the layout:
Print inspection
All comments from the supplier, printer and testing institute must be annotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
QM
checks whether the institute certificate or institute report has been uploaded and the flags confirmed.
Quality Management performs a quick check based on the agreed Product Specification Part 2 and the institute report.
Sequence approval loop:
1. Brand Management clicks on:
Correction, job changes to status 5
Design approval, job goes to supplier for review
2. Supplier clicks on (all users of the group are able to do that):
Correction, job goes to QM for review
Attention: Orange button only possible when using a testing institute!
Small correction to pre-press agency with shortened timings in the subsequent loop. (Only for declaratory comments, provided that the testing institute confirms marketability after correction. In the subsequent loop, a approval is mandatory.)
Final approval, marketability confirmed, job goes to Quality Management for review
3. Quality management clicks on:
Correction, job changes to status 5
approval based on agreed product specification
As soon as all parties have clicked , approval is given and job changes to status 6.
BM - All-in-One NAT
BM
The built layout is checked on the part of BM by a Quickcheck.
LF
With testing institute check:
The layout that has been built and approved by Brand Management must be checked by the supplier with a testing institute.
Attention: There is no correction loop before sending the layout to the testing institute. The requirements for the testing institute check can be found [here].
The following flag (task) will be triggered:
PI Check requested (Timing 4 business days)
After commissioning, the flag must be confirmed. Afterwards, the following flag is triggered:
Upload PI certificate (Timing 8 business days)
Once the certificate or report has been received, it must be checked for queries and open points and clarified with the testing institute if necessary before uploading it in Wave in the job details tab in the supplier area.
Note: After the correction the article doesn’t need to be sent to the testing institute again.
Due to the approval of the Brand Management, a print technical check is also necessary for the layout:
Print inspection
All comments from the supplier, printer and testing institute must be annotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
Without testing institute check:
The layout that has been built and approved by Brand Management must be checked by the supplier.
Due to theapproval of the Brand Management, an additional print-technical check for the layout is necessary:
Print inspection
All comments from the supplier and printer must beannotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
QM
With testing institute:
Quality Management checks whether the institute certificate or institute report has been uploaded and the flags confirmed.
Quality management performs a quick check based on the agreed product specification part 2 and the institute report.
Without testing institute:
Quality Management performs an check based on the agreed Product Specification Part 2.
Sequence approval loop:
1. Brand Management clicks on:
Correction, job changes to status 5
Design approval, job goes to supplier for review
2. Supplier clicks on (all users of the group are able to do that):
Correction, job goes to QM for review
Attention: Orange button only possible when using a testing institute!
Small correction to pre-press agency with shortened timings in the subsequent loop. (Only for declaratory comments, provided that the testing institute confirms marketability after correction. In the subsequent loop, a approval is mandatory.)
Final approval, marketability confirmed, job goes to Quality Management for review
3. Quality management clicks on:
Correction, job changes to status 5
approval based on agreed product specification
Once Quality Management has clicked , approval is given and job changes to status 6.
BM - Allowlist
BM
The built layout is checked on the part of BM by a Quickcheck.
LF
The layout that has been built and approved by Brand Management must be checked by the supplier.
Due to theapproval of the Brand Management, an additional print-technical check for the layout is necessary:
Print inspection
All comments from the supplier and printer must beannotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
QM
Quality Management performs an check based on the agreed Product Specification Part 2.
Sequence approval loop:
1. Brand Management clicks on:
Correction, job changes to status 5
Design approval, job goes to supplier for review
2. Supplier clicks on (all users of the group are able to do that):
Correction, job goes to QM for review
Final approval, marketability confirmed, job goes to Quality Management for review
3. Quality management clicks on:
Correction, job changes to status 5
approval based on agreed product specification
Once Quality Management has clicked , approval is given and job changes to status 6.
BM - Druckerwechsel
BM
The built layout is checked on the part of BM by a Quickcheck.
LF
The layout that has been created and approved by Brand Management must be checked by the supplier.
The approval by Brand Management also makes a print check of the layout necessary:
Print inspection
All comments from the supplier and printer must be annotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
Sequence approval loop:
1. Brand Management clicks on:
Correction, job changes to status 5
Design approval, job goes to supplier for review
2. Supplier clicks on (all users of the group are able to do that):
Correction, job goes to pre-press agency for adjustment
Approval
As soon as all parties have clicked , approval is given and the job changes to status 6.
BM - Fast Lane 1
BM
The built layout is checked on the part of BM by a Quickcheck.
LF
The layout that has been created and approved by Brand Management must be checked by the supplier.
The approval by Brand Management also makes a print check of the layout necessary:
Print inspection
All comments from the supplier and printer must be annotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
Sequence approval loop:
1. Brand Management clicks on:
Correction, job changes to status 5
Design approval, job goes to supplier for review
2. Supplier clicks on (all users of the group are able to do that):
Correction, job goes to pre-press agency for adjustment
Approval
As soon as all parties have clicked , approval is given and the job changes to status 6.
BM - Fast Lane 2
BM
The built layout is checked on the part of BM by a Quickcheck.
LF
The layout that has been created and approved by Brand Management must be checked by the supplier.
The approval by Brand Management also makes a print check of the layout necessary:
Print inspection
All comments from the supplier and printer must be annotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
QM
Sequence approval loop:
1. Brand Management clicks on:
Correction, job changes to status 5
Design approval, job goes to LF for review
2. Supplier clicks on (all users of the group are able to do that):
Correction, job goes to Quality Management for review
Final approval, marketability confirmed, job goes to Quality Management for review
3. Quality Management clicks on:
Correction, job changes to status 5
Approval on the basis of the agreed product specification
As soon as all parties have clicked , approval is given and the job changes to status 6.
BM - Relaunch Design
BM
The built layout is checked on the part of BM by a Quickcheck.
LF
The layout that has been created and approved by Brand Management must be checked by the supplier.
Due to the approval of the Brand Management, a print technical check is also necessary for the layout:
Print inspection
All comments from the supplier and printer must be annotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
Attention: Adjustments regarding declaration are not possible in the reason of change “Relaunch Design”!
QM
The layout that has been built and approved by Brand Management must be quick checked by the Quality Management.
Sequence approval loop:
1. Brand Management clicks on:
Correction, job changes to status 5
Design approval, job goes to supplier for review
2. Supplier clicks on (all users of the group are able to do that):
Correction, job goes to Quality Management for review
Final approval, marketability confirmed, job goes to Quality Management for review
3. Quality Management clicks on:
Correction, job changes to status 5
Approval on the basis of the agreed product specification
As soon as all parties have clicked , approval is given and the job changes to status 6.
BM - Tray
BM
The built layout is checked on the part of BM by a Quickcheck.
LF
The layout that has been created and approved by Brand Management must be checked by the supplier.
The approval by Brand Management also makes a print check of the layout necessary:
Print inspection
All comments from the supplier and printer must be annotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
Sequence approval loop:
1. Brand Management clicks on:
Correction, job changes to status 5
Design approval, job goes to supplier for review
2. Supplier clicks on (all users of the group are able to do that):
Correction, job goes to pre-press agency for adjustment
Approval
As soon as all parties have clicked , approval is given and the job changes to status 6.
QM - Dekla Anpassung INT
LF
The created layout must be checked by the supplier with a testing institute.
Attention: There is no correction loop before sending the layout to the testing institute. The requirements for the testing institute check can be found [here].
The following flag (task) is triggered:
PI Check requested (Timing 4 business days)
After commissioning, the flag must be confirmed. Afterwards, the following flag is triggered:
Upload PI certificate (Timing 8 business days)
Once the certificate or report has been received, it must be checked for queries and open issues, and clarified with the testing institute if necessary, before it must be uploaded in Wave in the job details tab in the supplier area.
Note: After the correction the article doesn’t need to be sent to the testing institute again.
All comments from the supplier and testing institute must be annotated in the Dalim Viewer, under the Correction Runs tab. A short manual can be found under Tutorials.
QM
checks whether the institute certificate or institute report has been uploaded and the flags confirmed.
Quality Management performs a quick check based on the agreed Product Specification Part 2 and the institute report.
Sequence approval loop:
1. Supplier clicks on:
Correction, job goes to QM for review
Attention: Orange button only possible when using a testing institute!
Small correction to repro with shortened timings in the subsequent loop. (Only for declaratory comments, provided that the testing institute confirms marketability after conversion. In the subsequent loop, an approval is mandatory.)
Final approval, marketability confirmed, job goes to Quality Management for review
2. Quality Management clicks on:
Correction, job changes to status 5
Approval based on agreed product specification
As soon as all parties have clicked , approval is given and the job changes to status 9.
QM - Dekla Anpassung NAT
LF
With testing institute:
The created layout must be checked by the supplier with a testing institute.
Attention: There is no correction loop before sending the layout to the testing institute. The requirements for the testing institute check can be found [here].
The following flag (task) is triggered:
PI Check requested (Timing 4 business days)
After commissioning, the flag must be confirmed. Afterwards, the following flag is triggered:
Upload PI certificate (Timing 8 business days)
Once the certificate or report has been received, it must be checked for queries and open issues, and clarified with the testing institute if necessary, before it must be uploaded in Wave in the job details tab in the supplier area.
Note: After the correction the article doesn’t need to be sent to the testing institute again.
All comments from the supplier and testing institute must be annotated in the Dalim Viewer, under the Correction Runs tab. A short manual can be found under Tutorials.
Without testing institute:
The created layout must be checked by the supplier.
All comments from the supplier must be annotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
QM
With testing institute:
Quality Management checks whether the institute certificate or institute report has been uploaded and the flags confirmed.
Quality management performs a quick check based on the agreed product specification part 2 and the institute report.
Without testing institute:
Quality Management performs an check based on the agreed Product Specification Part 2.
Sequence approval loop:
1. Supplier clicks on:
Correction, job goes to QM for review
Attention: Orange button only possible when using a testing institute!
Small correction to pre-press agency with shortened timings in the subsequent loop. (Only for declaratory comments, provided that the testing institute confirms marketability after conversion. In the subsequent loop, an approval is mandatory.)
Final approval, marketability confirmed, job goes to Quality Management for review.
2. Quality Management clicks on:
Correction, job changes to status 5
Approval based on agreed product specification
As soon as all parties have clicked , approval is given and the job changes to status 9.
QM - Allowlist
LF
The created layout must be checked by the supplier.
All comments from the supplier must be annotated in the Dalim Viewer, in the approval loop tab. A short manual can be found under Tutorials.
QM
Quality Management performs an check based on the agreed Product Specification Part 2.
Sequence approval loop:
1. Supplier clicks on:
Correction, job goes to QM for review
Final approval, marketability confirmed, job goes to Quality Management for review.
2. Quality Management clicks on:
Correction, job changes to status 5
Approval based on agreed product specification
As soon as all parties have clicked , approval is given and the job changes to status 9.
QM - Fast Lane 3
LF
No active task for the supplier, the Quality Management reviews the thermal label on the basis of the product specification.
QM
The thermal label created by the supplier and, if necessary, checked by a testing institute, is checked by QM (quick check for Eastern European languages).
Sequence approval loop:
1. Quality Management clicks on:
Correction, job changes to status 5
Approval on the basis of the agreed product specification
As soon as Quality Management has clicked , the approval is given and the job changes to status 9.